Hardware and Software Infrastructure –

The following are the achievements as of date: the design and analysis phases are 100% complete, liabilities analysis and design have been completed for the interface with the CSDRMS, process definition for sector/Ministry information upload has been concluded. 

GIFMIS general ledger integration/ analysis/design activities are underway and detailed information on general ledger structure were delivered for analysis/validation. It is critical to note that Hyperion software will run in GIFMIS platform (database) and the application will be in Windows platform at MoF. That is    expected to be completed by June 30 2014.